Client: General Directorate of State Hydraulic Works (DSI), Department
of Water Supply and Sewerage
The construction and the installation works have been completed and the station is under operation.
Client: General Directorate of State Hydraulic Works (DSI), Department of Water Supply and Sewerage
The construction and installation works have been completed and the reservoir is under operation.
Client: General Directorate of State Hydraulic Works (DSI), Department of Water Supply and Sewerage
The construction and the installation works have been completed and the reservoir is under operation.
Client: General Directorate of State Hydraulic Works (DSI), Department of Water Supply and Sewerage
The capacity of plant is 200.000 m3/day in first stage. After adding a clorifier and filter unit the capacity will be increased to 400.000 m3/day in second stage.
The designwork is completed. The construction and installation works are going on at the site. ERKA-AS is also providing technical consultancy services at the site to the contractor.
Client: Istanbul Metropolitan Municipality, General Directorate Of ISKI
The capacity of plant is 450.000 m3/day.
The designwork is completed. The construction and the installation works are about to be completed. ERKA-AS is also providing technical consultancy services at the site to the contractor.
Client: General Directorate of State Hydraulic Works (DSI), Department of Water Supply and Sewerage
The construction and installation works have been completed and works for startup of the plant are going on.
Client: General Directorate of State Hydraulic Works (DSI), Department of Dams and Hydropower Plants
ERKA-AS is also giving technical consultancy services at the site for contractor.
Client: Istanbul Metropolitan Municipality
Client: Istanbul Metropolitan Municipality, General Directorate Of ISKI
All wastewater of Üsküdar region is pretreated at the plant and than discharged to Bosphorus.
Complete designwork is carried out. The construction is completed. The systems is in operation.
Client: General Directorate of Iller Bank, Department of Water Supply
The capacity of plant is 10.000 m3/day. The designwork is completed.
Client: General Directorate of Iller Bank, Department of Water Supply
The capacity of plant is 43.000 m3/day. The design work is completed.
Client: General Directorate of State Hydraulic Works (DSI)
Client: General Directorate of State Hydraulic Works (DSI)
Client: Adana Metropolitan Municipality
The viaduct is in use since 1992.
Client: General Directorate of IllerBank
The designwork is completed.
Client: General Directorate of State Hydraulic Works (DSI)
The designwork is completed.
Client: General Directorate of State Hydraulic Works (DSI)
The designwork and construction works is completed. The system is in operation.
Client: General Directorate of IllerBank
The designwork is completed.
Client: Municipality of Ankara
The design works and construction works is completed. The complex is inhabited.
Client: General Directorate of EmlakBank
Construction is completed. The houses are inhabited
Client: Municipality of Gaziantep
The design work is completed.